Main Boom – 180’, 1-10’, 1-20’, 2-40’ #82 Upper Boom Point - No Jib – Yes, 50’ #134 Block – 200 Ton, six sheave Ball – 15 Ton swivel hook Air Conditioned Luffer Prepped Hours – The hour meter has been replaced at (0362). Repairs- Engine, master clutch and cooling system replaced, swing bearing replaced, load lone replaced and complete paint.